摘要
机械设备是管道工程公司生存、发展的根本,是完成施工任务的基础。随着管道施工机械化程度的提高,机械使用成本在整个工程成本中所占的比例越来越大。机械设备管理还直接关系到工程的施工进度和施工质量。
The machinery equipment is the main part of pipelines company which can ensure them in finishing the project.With the development of the mechanization on the pipehne construction,the mechanism costs are rising,and possess about 20% in the whole costs,at the same time,the mechanism management is also the main factor in the construction quality and its costs take a large proportion in the whole costs.So,the appropriate mechanism costs is vital to decrease the mechanism management costs and meet a good benefits.This article makes a discussion especially from optimization on construction factors,equipments using and maintenance etc.