桩筏基础与格式基础的联合设计 被引量:2

The Joined Design of Piled Raft Foundation and Grid Foundation
在线阅读 下载PDF
导出
摘要 通过对安阳市人民银行营业办公楼的体型特点进行基础方案比较,确定中段(16层)采用桩筏基础,两边段(5层)为格式基础,分离施工,待沉降趋于稳定后再做后浇带的联合设计方法.重点是加大筏底土的荷载分担作用,并符合沉降控制要求.与纯桩基方案相比施工快、效益好. Comparing the foundation schemes for formative art characteristics of the Office Building of P.By Anyang City, we adopts a design method of separated construction, the middle part (16 floor) built on piled raft foundation while the two sides of building(5 floor) on grid foundation. After settlement of ground becomes steady, the tie plate pour of concrete is conducted. This method is to strengthen the function of the ground under the raft to burden loads and fit demand of controlling settlement.
作者 沈鸣 李海
出处 《建筑结构》 CSCD 北大核心 1997年第4期3-6,共4页 Building Structure
关键词 联合设计 桩土分担荷载 桩筏基础 格式基础 joined design sharing load pile ground analysis controlling the settlement
  • 相关文献

参考文献1

共引文献3

同被引文献18

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部