摘要
宣钢7号高炉(450m3)中修后通过充分准备、制订合理方案、精心操作,在开炉后3天达产,创造了宣钢开炉达产的最好水平。
With full preparation, a reasonable schedule made and meticulous operation, No. 7 blast furnace (450 m^3) reached its output rate in 3 days following the blowing on after its middle repair.
出处
《河北冶金》
2007年第3期31-33,共3页
Hebei Metallurgy
关键词
高炉
中修
开炉
达产
blast furnace
middle repair
blowing on
reach its output rate