期刊文献+

电力市场下基于改进遗传算法的AGC机组的选择

AGC Units'Selection Based on Genetic Algorithm in Electricity Market
在线阅读 下载PDF
导出
摘要 针对电力市场下参与竞标的各AGC机组的选择问题,提出了一种基于实数和二进制数混合编码,个体分段交叉变异的改进遗传算法.该算法采用实数模拟AGC机组的调节容量,无需解码,具有较高的收敛精度,同时采用二进制编码模拟AGC机组中标状态,充分利用了两种编码方式的优点;对群体中的个体采用了轮盘赌选择,并按容量段、状态段分别进行交叉、变异的遗传操作方法,较好的解决了电力市场下AGC机组选择这一0-1混合整数非线性规划问题.最后通过对某省实际电网的算例分析,验证了该算法的可行性. For the selection problem of AGC units in a deregulated power system, the paper presents a new improved genetic algorithm based on the complex code of decimal and binary system. In this algorithm, the decimal system is used to simulate the regulation capacity of AGC unit, and the binary system to the chosen- state of AGC unit. It effectively combines the two code' s advantage. In the colony, through individuals' genetic operation of roulette selection and the cross and mutation which operate respectively as capacity segment and state segment, the nonlinear mixed 0 - 1 programming problem of AGC units'selectiong is solved preferably. The example applied to a practical system indicates that proposed method is feasible.
出处 《内蒙古民族大学学报(自然科学版)》 2007年第5期522-526,共5页 Journal of Inner Mongolia Minzu University:Natural Sciences
关键词 电力市场 辅助服务 AGC 改进遗传算法 Electricity market Ancillary services AGC Improved genetic algorithm
  • 相关文献

参考文献7

二级参考文献33

  • 1文劲宇,刘沛,程时杰.遗传算法及其在电力系统中的应用(上)[J].电力系统自动化,1996,20(10):57-60. 被引量:29
  • 2文劲宇,刘沛,程时杰.遗传算法及其在电力系统中的应用(下)[J].电力系统自动化,1996,20(11):60-65. 被引量:13
  • 3[2]Jaleeli Nasser, Vanslyck L S, Ewart Donald, et al. Understanding Automatic Generation Control. IEEE Trans on Power Systems, 1992, 7(3): 1106~1122
  • 4[4]Rau Narayan S. Optimal Dispatch of a System Based on Offers and Bids-- A Mixed Integer LP Formulation. IEEE Trans on Power Systems, 1999, 14(1): 274~279
  • 5[5]Singh Harry, Papalexopoulos Alex. Competitive Procurement of Ancillary Services by an Independent System Operator. IEEE Trans on Power Systems, 1999, 14(2): 498~504
  • 6Jaleeli Nasser , Vanslyck L S , Ewart D, et al. Understanding Automatic Generation Control. IEEE Trans on Power Systems,1992,7(3): 1106-1122.
  • 7Chown G A, Coetzee M G. Implementation of Regulation as an Ancillary Service in Eskom and Use of Eskom Internet Web for this Service. IEEE Trans on Power Systems, 2000, 15 (3):1132-1136.
  • 8Singh Harry, Papalexopoulos Alex. Competitive Procurement of Ancillary Services by an Independent System Operator. IEEE Trans on Power Systems, 1999,14(2): 498-504.
  • 9Cheung Kwok W, Shamsollahi Payman, Sun David, et al.Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market. IEEE Trans on Power Systems,2000,15 (3): 968-974.
  • 10Fosso B Olav, Gjelsvik Anders, Haugstad Arne , et al.Generation Scheduling in a Deregulated System--The Norwegian Case. IEEE Trans on Power Systems, 1999,14( 1):75-81.

共引文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部