针对大单翼长采区深部开采的实际情况,对采区进行了统一规划,分区、分步进行设计开采;同时根据各区、各面的基本情况,采取了一系列的措施,进行系统改造,改进施工工艺,更新电气设备,优化巷道布置,从而实现了矿井的安全生产,完成了矿井高产高效的建设。
Aimed at the actual situation of singlefin long mining area deep mining, taked the unified planning for the mining, design exploitation varies with subarea and situation of area, substep. At the same time, aimed at the fundamental situation of every area and face, adopted a series of measures, improved construction technology, updated electrical equipments, and optimized the roadway layout, thus realized the mine production safety, High - yield and efficient forward to the completion of the mine.