期刊文献+

肋拱桥拆除方案探讨 被引量:4

Scheme Analysis of Rib-arch Bridge Demolish
在线阅读 下载PDF
导出
摘要 以某肋拱桥拆除方案为例,剖析了其中存在的一些问题,指出了拱桥拆除中容易忽略的一些环节。桥梁拆除安全事故易发、多发、频发,只有参建各方高度重视桥梁拆除的安全管理工作,全面收集需拆除桥梁的各项资料,科学编制桥梁拆除方案,强化方案专家审查制度,提前做好各项保障措施,精心组织拆除施工,加强拆除过程的监控,才能确保桥梁安全无事故拆除。 This paper analyzes the problems found in a rib-arch bridge demolish scheme, and indicates some important process that are easily neglected during demolish.Accidents often happens when demolishing without enough attention paid by all parties involved and without proper safety management.It is necessary to prepare a scientific and reasonable scheme,collect all related documents and implement strictly the expert review policy,and to manage demolishing carefully, take the precaution actions in earlier stage and monitor demolish process.
出处 《现代交通技术》 2007年第5期56-59,共4页 Modern Transportation Technology
关键词 桥梁 拆除 问题 剖析 bridge demolish problem analysis
  • 相关文献

参考文献3

  • 1[3]交通部公路规划设计院.公路设计手册-拱桥(上、下)[M].北京:人民交通出版社,1978.
  • 2[4]交通部第一公路工程总公司.桥涵(上、下)[M].北京:人民交通出版社,2000.
  • 3[5]交通部2007年第1号令.公路水运工程安全生产监督管理办法[Z].

同被引文献13

引证文献4

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部