摘要
本文分析了梅山铁矿采矿一期和延深衔接过程中存在的问题。
In this paper, the existing problems in firsl -phase mining and deepening are analysed, andthe measureses for improving mining technology and the methods for quickly realizing the of hoisting transfer are proposed.
出处
《中国矿业》
北大核心
1997年第3期32-34,共3页
China Mining Magazine
关键词
盲矿体
采矿工艺流程
铁矿
提升运输
Blind ore body, First-phase deepening, Mining process, New system