摘要 台华高速公路采用干振碎石桩进行软土地基处理,在路堤填筑过程中发生了地基失稳滑移。通过数值方法对路堤填筑过程中地基沉降、超静孔隙水压力及地基塑性区的发展变化进行了模拟计算,并结合现场补勘数据,分析了引起路堤失稳滑移的原因。在此基础上,提出刚性桩地基处理加固方案。数值计算及现场勘查结果表明,在强度较低的软土中采用干振碎石桩进行地基处理是不成功的,施工不仅没有形成完整的碎石桩体,还因扰动降低了原状地基土强度,路堤填筑速度过快则直接导致了地基滑移破坏;当采用刚性桩加固软基时,桩间土仅承担小部分路堤荷载,而大部分路堤荷载由桩承担并传递给深层承载力较高的土层,因此路堤的稳定性高、沉降小,可实现快速填筑。数值分析及现场刚性桩试验段测试结果均表明:刚性桩方案可以满足路堤填筑要求。 Numerical method combined with field investigation is employed to explore the sliding failure mechanism of Taihua highway embankment during construction,which is built on soft soils and the soft soils are improved with stone columns.The analytical results show that the original design using stone columns to improve soft soils is not acceptable because the undrained shear strength of the soft soils is too low to confine the stone columns efficiently.As a result,no completed stone columns are formed in the soft soils,with which the high rate of embankment filling causes the sliding failure of the embankment slope.In addition,a treatment method by using rigid concrete tube-pile is presented.For the compression stiffness of pile is greater than those of soft soils,most of the embankment loads are borne by piles,and the remaining load is carried by the soft soils,which allow the embankment to be built in a single stage without further endangering of undrained failure of soft soils and the settlement of embankment can be reduced.Numerical analysis and field monitoring results both demonstrate that the soft soils treated by using rigid concrete tube-pile is successful.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2007年第7期1504-1510,共7页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金资助项目(50308026)
关键词 土力学 软土 高速公路 地基处理 碎石桩 钢筋混凝土管桩 soil mechanics soft soils highway soil improvement stone column reinforced concrete tube-pile
  • 相关文献

参考文献12

二级参考文献37

  • 1[1]JONES C J F P,LAWSON C R,AYRES D J. Geotextile reinforced piled embankments[A]. Proc. 4th Int.Conf. on Geotextiles:Geomembranes and Related Products[C]. Rotterdam: Balkema, 1990. 155-160.
  • 2[2]HAN J, GABR M A. Numerical analysis of geosynthetic-reinforced and pile-supported earth platforms over soft soil[J]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 2002,128(1): 44-53.
  • 3[3]HEWLETT W J,RANDOLPH M F. Analysis of piled embankments[J ]. Ground Engineering, 1988,21 ( 3 ):12-18.
  • 4[4]HAN J,AKINS K. Use of geogrid-reinforced and pilesupported earth structures[A]. Proceedings of International Deep Foundation Congress [C]. Orlando: ASCE,2002. 668-679.
  • 5[5]American Association of State Highway and Transportation Officials (AASHTO). Innovative technology for accelerated construction bridge and embankment foundations[R]. Washington: Federal Highway Administration,2002.1-11.
  • 6[6]LOW B K,TANG S K,CHOA V. Arching in piled embankments[J]. Journal of Geotechnical Engineering,ASCE,1993, 120(11):1 917-1 938.
  • 7团体著者,1989年
  • 8钱鸿缙,湿陷性黄土地基,1985年
  • 9黄熙龄,地基基础的设计与计算,1981年
  • 10吴廷杰,1992年

共引文献854

同被引文献285

引证文献23

二级引证文献514

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部