大峪口磷矿选矿试验及选矿厂工艺调试 被引量:5

Mineral processing test and industrial adjustment on Dayukou phosphate ore
原文传递
导出
摘要 大峪口矿肥结合工程是我国“八五”重点建设项目之一.我院经过十几年的开发研究,先后完成了实验室试验、1.5t/d连续试验、50t/d半工业性试验、捕收剂代用试验和150万t/a选矿厂工业调试,取得了磷精矿含P2O533.47%~34.63%,回收率77%~78%的选矿指标。我院研制的新型捕收剂pA-42和碳酸盐脉石矿物有效抑制剂S711,在大峪口磷块岩选矿中都有良好表现。 Dayukou combined project of mineral and fertilizeris one of the key proects in the Eighth Five - Year Plan. Our in-stitute has finished the laboratory tcst, 1. 5t/d continnous test,50t/d pilot test, substitute test of collector and 1. 5million t/a in-dustrial adjustment for the project by over ten years' developmentand study. The phosphate concentrate with the grade of P2O5 33.47 ~ 34. 63 % and the recovery of 77% ~ 78 % has been obtainedin industrial adjustment. New type of collector PA - 42 and de-pressor of carbonate gangue S711 developed by our institute havebeen successfully used in Dayukou phosphale rock proccssing.
出处 《化工矿山技术》 1997年第2期17-19,12,共4页
关键词 磷矿 选矿 浮游选矿 工艺调试 Phosphate rock Floatation, PA - 42, S_(711)
  • 相关文献

同被引文献112

引证文献5

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部