摘要
根据平阳鳌江第二水厂工程的特殊地理位置及地质条件,采用加劲水泥搅拌桩和锚钉的支护方案,对该方案的支撑体系和原理进行了分析,详细介绍了该工程的施工方法,并对该工程进行了监测,监测结果验证了该支护方法的可行性。
According to the special geographic position and the geological condition of the second water plant project in Aojiang Pingyang, it adopted the support program of stiffened cement mixed piles and anchor, analyses the supporting system and principle of the program, specifically introduces the construction methods of the projects and detects it, the detecting affect illustrate the feasibility of the supporting method.
出处
《山西建筑》
2007年第30期133-134,共2页
Shanxi Architecture
关键词
深基坑
水泥搅拌桩
锚钉
施工
地质条件
deep foundation, cement mixed pile, anchor, construction, the geological condition