4GORONSZY M C,DEMOULIN G,NEWLAND M.Aerated denitrification in full-scale activated sludge facilities[J].Water Science and Technology,1996,34 (1/2):487-491.
5DEMOULIN G,RUDIGER A,GORONSZY M C.Cyclic activated sludge technology-recent operating experience with a 90,000 p.e.plant in Germany[J].Water Science and Technology,2001,43 (3):331-337.
6DEMOULIN G,GORONSZY M C,WUTSCHER K,et al.Co-current nitrification/denitrification and biological P-removal in cyclic activated sludge plants by redox controlled cycle operation[J].Water Science and Technology,1997,35 (1):215-224.
7WANG Yayi,ZHANG Zhaoxiang,YAN Min,et al.Impact of operating conditions on nitrogen removal using cyclic activated sludge technology(cast)[J].Journal of Environmental Science and Health,Part A:Toxic/Hazardous Substances and Environmental Engineering,2010,45 (3):370-376.