1G.Sommer. Fuzzy Inventory Scheduling, in: G.E. Lasker(ED.), Applied Systems and Cybeneties, VI[M]. New York:Oxford, Toronto, 1981:3052-3060.
2Li L S, Kabadi S N, Nair K P K. Fuzzy Models for Single-Period Inventory Problem [J]. Fuzzy Sets and Systems, 132 (2002): 273-289.
3Kacprzyk J, Staniewski P. Long-term Inventory Policy-Making Through Fuzzy Decision-Making Models[J]. Fuzzy Sets and Systems, 1982,(8): 117-132.
4H. Ishill, T. Konno. A Stochastic Inventory Problem with Fuzzy Shortage Cost[J]. European Journal of Operational Research,1998, 106,90-94.
5Roy, T. K., and Maiti, M.. A fuzzy EOQ Model with DemandDependent Unit Cost Under Limited Storage Capacity [J]. European Journal of Operational Research, 1997,(99): 425-432.
6Mondal S, Maiti M. Multi-Item Fuzzy EOQ Models Using Genetic Algorithm[J]. Computers & Industrial Engineering, 2002,44: 105-117.
5Tersine R J.Principles of inventory and materials management[M].Amsterdam:North-Holland.1982.
6Liao C J.Shyu C H.An analytical determination of lead time with normal demand[J].International Journal of Operations Production Management,1991,11(9):72~78.
7Ouyang L Y,Chuang B R.A periodic review inventory model involving variable lead time with a service level constraint[J].International Journal of Production Research,2000,31(10):1209~1215.
8Petrovic D,Sweeney E.Fuzzy knowledge-based approach to treating uncertainty in inventory control[J].Computer Integrated Manufacturing Systems,1994,7 (3):147~152.
9Roy T K,Maiti M.A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity[J].European Journal of Operational Research,1997,99:425~432.
10Gen M,Tsujimura Y,Zheng P Z.An application of fuzzy set theory to inventory control models[J].Computers and Industrial Engineering,1997,33:553~556.