摘要
在第六次大面积提速调图后的新形势下,结合"天窗"修工作现状,从检修工作量与"天窗"次数的合理确定、"天窗"点内点外作业安排、设备状态和人的状态控制、工电协作联整设备、状态修与"天窗"修有机结合等5个方面展开了思考。
Under the situation of train diagram adjustment of the sixth train speed raising program and in combination of the status of skylight maintenance, it should be considered from five aspects under below : maintenance workload and reasonable confirmation of skylight times, working arrangement of both inside and outside the skylight, status control of equipment and man work, equipment renovation collaborated by both the divisions of permanent way and C&S, and combination of status maintenance and skylight maintenance.
出处
《铁道通信信号》
2007年第9期27-28,共2页
Railway Signalling & Communication
关键词
提速
天窗修
思考
Train speed raising
Skylight maintenance
Consideration