摘要
介绍了舟山桃夭门大桥钢箱梁斜拉索销铰连接模型试验研究,重点介绍了模型的结构及加载系统的设计。通过理论计算分析并与实测结果对比发现,试验结果令人满意。
This paper presents the model test and study of pin hinge connections of stay cables on steel box girder of Taoyaomen Bridge in Zhoushan and describes in particular the model structure and design of loading system. The results yielding from the test prove to be quite satis- factory through comparison of the results to the theoretic calculation and analysis.
出处
《桥梁建设》
EI
CSCD
北大核心
2003年第B05期83-86,89,共5页
Bridge Construction
关键词
斜拉桥
斜拉索
销铰连接
应力分布
模型试验
cable-stayed bridge
stay cable
pin hinge connection
stress distribution
model test