摘要 武汉天兴洲公铁两用长江大桥主桥为(98+196+504+196+98)m双塔三索面钢桁斜拉桥,主梁为3片主桁的板桁结合钢桁梁,上层为6车道公路,下层为双线客运专线、双线Ⅰ级铁路。其中铁路桥面采用纵横梁体系的混凝土板结合道碴桥面。介绍铁路混凝土板结合桥面系模型试验的结构设计及试验方法。 The main bridge of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge is a double pylon and triple cable plane steel truss cable-stayed bridge with span arrangement (98 +196+504+196+98) m. The main girder of the bridge is a composite girder made up of three main steel trusses and concrete slabs. On the upper deck of the bridge, six-lane roadway is arranged while on the lower deck, the double-track passenger dedicated railway, the Grade Ⅰ doub- le-track railway, is set. Of the overall main bridge, the railway deck is designed as a concrete slab composite ballast deck formed by longitudinal and transverse girder system. In this paper, the structural design and testing methods for the test models of the concrete slab composite railway floor system are presented.
出处 《桥梁建设》 EI CSCD 北大核心 2007年第4期9-12,共4页 Bridge Construction
关键词 铁路公路两用桥 斜拉桥 桥面系 模型试验 设计 rail-cum-road bridge cable-stayed bridge floor system model test design
  • 相关文献

参考文献4

  • 1TB10002.2-2005,铁路桥梁钢结构设计规范[S].
  • 2GB/T10433-2002,电弧螺柱焊用圆柱头焊钉[S].
  • 3TB10082-2005.铁路轨道设计规范[S].[S].,2004..
  • 4GB50090-99.铁路线路设计规范[S].[S].,..

共引文献203

同被引文献12

引证文献2

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部