高喷灌浆技术在尼那水电站二期围堰工程中的应用 被引量:1

Application of High-jet Grouting to Second Stage Cofferdam in Nina Hydropower Station
在线阅读 下载PDF
导出
摘要 黄河尼那二期下游围堰及部分上游围堰采用高喷灌浆技术,成功地在夹河卵砾石中构筑了二期围堰防渗工程。在分析场地水文地质与工程地质条件的基础上,研究了围堰防渗工程的结构形式与工程布置,探讨了施工工艺和质量控制问题。 High-jet grouting was successfully applied for the anti-seepage works of the second stage downstream cofferdam and part of upstream cofferdam with a geological condition of river cobble and gravel in Nina Hydropower Station. Based on EHG analysis of hydrogeologic and engineering geologic conditions on site, the pattern and arrangement of high-jet grouting were investigated particularly, while the construction technology and quality control were explored in detail.
作者 刘鹏程 杨建平 赵玉杰 LIU Peng-cheng, YANG Jian-ping, ZHAO Yu-jie (Sino-hydro Foundation Engineering Corporation, Tianjin 301700, China)
出处 《电网与水力发电进展》 2007年第4期62-64,共3页
关键词 高喷灌浆 防渗工程 围堰 尼那水电站 high-jet grouting anti-seepage works cofferdam Nina hydropower station
  • 相关文献

参考文献3

共引文献9

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部