本文结合浙江岱山2×12000kw发电厂现场的碎石桩加固软土地基的实际工程,进行静载荷试验,并通过载荷板下埋设土压力盒和孔隙水压力计,对碎石桩加固沿海软土地基的加固机理进行研究。
Associated with the Works of stabilizing the soft soil ground with stone column on the site of a 2×12000kw power plant in Daishan,Zhejiang province, static load test was carried out. Studies on stabilization mechanism of coastal soft soil with stone column were done through pressure cells and piezometer embedded under the loading plate
出处
《工程勘察》
CSCD
北大核心
1990年第5期1-6,共6页
Geotechnical Investigation & Surveying