摘要
本文利用姑山铁矿区疏干工程的实际资料,介绍多层地下水矿区放水孔和坑道疏干的一种数值方法,取得满意的结果。
A numerical method for dewatering of water outlet and pit in mining area of multi-layer of groundwater by using the real data of dewatering works done in an iron mining area of Gushan are presented in this paper. The results achieved are satisfactory.
出处
《工程勘察》
CSCD
北大核心
1990年第5期30-35,共6页
Geotechnical Investigation & Surveying