期刊文献+

Speeding Up the Construction of Modern Grid Corporation

Speeding Up the Construction of Modern Grid Corporation
在线阅读 下载PDF
导出
摘要 The general work requirements of the State Grid Corporation in 2007 are, pursuant to the ideology of scientific development, to insist on the policy of simultaneous development in capital construction and technical renovation, to carry out group operation, intensified development, careful management and standardized construction, to strengthen backing of science, technology and talented personnel, to speed up the transformation on development modes of the corporation and the power grid, and to create a harmonious enterprise in an all-round way as a strategy of development. The general work requirements of the State Grid Corporation in 2007 are, pursuant to the ideology of scientific development, to insist on the policy of simultaneous development in capital construction and technical renovation, to carry out group operation, intensified development, careful management and standardized construction, to strengthen backing of science, technology and talented personnel, to speed up the transformation on development modes of the corporation and the power grid, and to create a harmonious enterprise in an all-roundway as a strategy of development.
出处 《Electricity》 2007年第2期11-14,共4页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部