摘要
龙潭河特大桥采用连续刚构体系,其桥墩最高达178 m。为了分析桥墩及桩基础对桥梁结构的受力影响,建立考虑桩基作用及墩底固结两个不同的计算模型,计算和比较了箱梁施工预拱度及温度荷载作用下的结构控制截面的弯矩。
Longtan River Bridge is designed as a continuous rigid-frame bridge with its highest pier up to 178 m. In order to analyze the force influence of the bridge pier and the pile foundation on the bridge structure,this article establishes two different computation models of considering pile foundation action and with fixity at the base of pier, analyzing and comparing the box beam construction camber and the bending moments of structure control sections under temperature loading of both models.
出处
《中南公路工程》
2007年第3期46-49,共4页
Central South Highway Engineering
基金
中南林业科技大学人才引进启动项目(06Y027)
关键词
连续刚构桥
高墩
桩基础
温度荷载
施工预拱度
the continual rigid frame bridge
high-rise pier
pile foundation
temperature load