无功自动调节系统遥控成功率较低的原因分析和改进 被引量:1

Case Study and Improvement of Lower Successful Rate of Remote Control for VQC
在线阅读 下载PDF
导出
摘要 常州市武进供电公司所辖变电所全部实行无人值班后,在调度自动化系统中使用地区电网无功电压优化运行集中控制系统(VQC)的过程中出现遥控成功率不高的情况。通过检查测试,发现一旦从遥控命令至遥控成功记录的时间超过30s时,则遥控失败。指出DF-8002前置机是主要的延时源,体现在安装的问答式规约存在缺陷及本身的应用软件存在问题,改进措施实施后,遥控成功率达到97.7%,超过预期目标值95%。 The substations in Changzhou Wujin Power Supply Co. are all unattended. During the use of regional power network VQC of dispatching automation system, the condition of lower successful rate for remote control was existent. Through inspecting test, it was discovered that the failure of remote control occurred when the time from the order of remote control to the successful record of remote control exceeded 30 s. It is pointed out that DF - 8002 is the major source of delay time, which indicates the defects of protocol of questions and answers in installation and the existent problems in application software. After improvement measures are implemented, the successful rate of remote control reaches 97.7% , which exceeds the 95% of expected goal value.
作者 王奕
出处 《电力设备》 2007年第7期60-62,共3页 Electrical Equipment
关键词 变电所 无人值班 遥控成功率 VQC 前置机 延时 substation unattended successful rate of remote control VQC pre- machine delay time
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部