摘要
大跨度高支撑预应力梁一直是工程施工的重点和难点,本文以泰州海陵社区服务中心工程为例,具体介绍了在低成本条件下,通过施工设计和验算用增加模板支撑立杆数量和增强支撑体系整体性的施工措施和手段,解决了24m跨、10m以上高支撑预应力梁的施工问题。
It is a key and difficult point to construct large-span high-brace pre-stressed beams. Setting an engineering example: Taizhou Hailing public service center engineering, this paper describes the construction techniques in details. Under the lowcost condition, measures of increasing support vertical poles and strengthening support system integrality have been adopted, combined with construction design and calculation, to solve the construction problem of 24-meter span ,more than 10 meter high brace, prestressed beams.
出处
《泰州职业技术学院学报》
2007年第3期31-33,共3页
Journal of Taizhou Polytechnic College
关键词
大跨度
高支撑
预应力梁
施工工艺
large-span
high-brace
pre-stressed beam
construction techniques