太行山隧道7^#斜井工区施工运输方案的优化 被引量:7

Optimization of Transportation System of Working Lot of No.7 Inclined Shaft of Taihangshan Tunnel
在线阅读 下载PDF
导出
摘要 根据太行山隧道设计参数及工程地质情况,从有轨和无轨运输的实际可行性,综合考虑施工进度、设备资源的合理利用以及提高运输的安全系数,使工程施工在质量、进度和安全等方面达到更合理有效的控制,对正洞有轨和无轨运输施工方案进行了综合比选,正洞无轨运输方式具有很大优势,工程综合效率得到明显提高,对同类工程施工有参考价值。 On basis of the design parameters and the engineering geology of Taihangshan tunnel, comprehensive comparison and contrast are made for the rail-bound transportation system and trackless transportation system for the construction of the main tunnel of working lot of No. 7 inclined shaft of Taihangshan tunnel in terms of construction advance rate, fulluse of the equipment resources and the transportation safety factor. The analysis result indicates that the trackless transportation system has great advantages and can dramatically improve the comprehensive efficiency of the works. The paper can provide reference for Similar works in the future.
作者 陈军 时思鹏
出处 《隧道建设》 2007年第A01期52-54,共3页 Tunnel Construction
关键词 隧道 斜井 施工 运输方案 优化 tunnel inclined shaft construction transportation system optimization
  • 相关文献

参考文献1

二级参考文献1

  • 1[1]康世荣.水利水电工程施工组织设计手册第二卷施工技术[M].北京:中国水利水电出版社,1990.

共引文献1

同被引文献50

引证文献7

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部