摘要 在分析ERP中CRP算法存在不足的基础上,研究了CRP中工作中心负荷的计算方法,指出标准CRP算法在计算工作中心负荷时与实际负荷分布存在明显偏差,在此基础上提出了考虑负荷实际分布的分时段CRP改进算法,建立了基于这一原理的CRP算法模型,并以实际案例验证了这一改进算法的正确性与价值,对相关问题进行了讨论. This paper studies the load algorithm of work center through analyzing the problems of the general CRP algorithm. It points out that the work center load result based on the CRP algorithm doesn't correspond with the distributed real load, which takes the total of the load starting from the time bucket as the total load of the work center in the time bucket. Accordingly, it puts forward an improved CRP Algorithm considering time bucket and distributed real load and establishes the algorithm model . With the help of the case data, the validity of the algorithm is tested and the relative factor on the algorithm is also discussed at last.
作者 黎小平
出处 《成组技术与生产现代化》 2007年第2期29-32,共4页 Group Technology & Production Modernization
基金 国家863/CIMS成都飞机工业(集团)有限责任公司CIMS三期工程重点项目
关键词 ERP CRP CRP改进算法 enterprise resource planning capacity requirements planning improved CRP Algorithm
  • 相关文献

参考文献9

二级参考文献33

  • 1李莹,汪定伟.多工序能力平衡的提前/拖期生产计划方法的关键工序法[J].系统工程理论与实践,1996,16(3):7-15. 被引量:4
  • 2初壮,MRP Ⅱ原理与应用基础,1997年
  • 3张毅,制造资源计划MRP-Ⅱ及其应用,1997年
  • 4夏绍伟,系统工程概论,1995年
  • 5王广宇.客户关系管理(CRM)[M].北京:经济管理出版社,2001.
  • 6Hautaniemi Petri Pirttila, Timo. The Choice of Replenishment Policies in an MRP Environment[J]. International Journal of Production Economics, 1999, 59 (3): 85 ~ 92
  • 7Hong Kyung-Kwon, Kim Young-Gul. The Critical Success Factors for ERP Implementation: an Organizational fit Perspective [J].Information and Management, 2002, 40( 1 ): 25 ~ 40
  • 8Jin Guang, Thomson Vince. A New Framework for MRP Systems to be Effective in Engineered-to-order Environments [ J ]. Robotics and Computer-Integrated Manufacturing, 2003, 19 (6): 533 ~ 541
  • 9Ould-Louly, Mohamed-Aly, Dolgui Alexandre. The MPS Parameterization under Lead Time Uncertainty[J]. International Journal of Production Economics, 2004, 90 (3): 369 ~ 376
  • 10CHAND S,MCCLURG T,WARD J. A model for paralell machine replacement with capacity expansion[J]. European Journal of Operational Research, 2000,121:519-531.

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部