宝钢3号高炉喷吹系统改造实践 被引量:1

Revamping of injection system of Baosteel's No.3 blast furnace
在线阅读 下载PDF
导出
摘要 宝钢3号高炉通过对喷吹系统总管、分配器、支管等设备的改造,消除了阻碍喷煤比提高的瓶颈,使喷煤能力得到大幅度提高,工艺参数的设置更加合理。在喷煤系统能力得到提高的同时,系统操作参数的优化也使喷吹管线堵塞的次数大大减少,为高炉均喷、广喷创造了条件。高炉喷煤比的提高,取得了显著的经济效益。 Revamping of Baosteel' s No. 3 blast furnace with respect to main pipe, distributor and branches of injection system breaks through the bottleneck of achieving higher coal injection ratio, makes the injection capacity improved greatly and process data more reasonable. In turn, higher pulverized coal injection capacity and optimized operation data of the system also considerably lessen blockage of injection pipe and create preconditions for even and far injection effect, resulting in better economic benefit.
作者 张永忠
出处 《炼铁》 北大核心 2007年第3期10-12,共3页 Ironmaking
关键词 大型高炉 喷吹煤粉 设备改造 large sized blast furnace pulverized coal injection revamping of equipment
  • 相关文献

参考文献1

二级参考文献6

  • 1Hettiaratchi K,Woodhead SR,Reed AR.Comparison between pressure drop in horizontal and vertical pneumatic conveying pipelines.Powder Technology ,1998,95(1):67~73
  • 2Kalman H.Attrition control by pneumatic conveying.Powder Technology,1999,104 (3):214~220
  • 3Bilirgen H,Levy E,Yilmaz A.Prediction of pneumatic conveying flow phenomena using commercial CFD software.Powder Technology ,1998,95 (1):37~41
  • 4Pan R,Chambers J.Pneumatic conveying of iron ore in a high pressure system.Part B:Details of test runs and scale-up procedures.Bulk Solids Handling,1999,19(3):321~327
  • 5Laouar S,Molodtsof Y.Experimental characterization of the pressure drop in dense phase pneumatic transport at very low velocity.Powder Technology,1998,95(2):165~173
  • 6杨辉,林建忠,吴法理.气力输送系统计算机设计软件的开发[J].煤矿机械,2003,24(2):1-3. 被引量:9

共引文献16

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部