摘要
文章以采用顶推法施工的某大桥为工程背景,详细介绍了落梁方案、落梁前的准备及落梁过程,提出了落梁控制原则,对同类桥梁的落梁施工具有重要的借鉴价值。
The article, taking the incremental launching construction of one bridge as an example, introduces in detail the project, preparation and process of beam placement, proposes principles in the control of beam placement, which may provide reference for beam placement of bridges of the same kind.
出处
《山西科技》
2007年第3期148-148,F0003,共2页
Shanxi Science and Technology
关键词
顶推
落梁
施工控制
incremental launching
beam placement
construction control