摘要
鞍钢3号高炉在1995年8月21日~11月20日达续92天实现了在低富氧条件下203kg/t铁的高喷煤比氧煤强化冶炼试验任务.冶金部组织的鉴定认为,该试验成果已达国际先进水平.
Oxy-coal intensified smelting Process experiment on AISC No. 3 BF had been completed at low oxygen-enriched and high PC ratio 203 kg/t within 92 consecutive days from Aug. 21 to Nov. 20, 1995. Appraisal by Metallurgical Industry Ministry confirms that the result of this expriment has reached to the international advaneed level.
出处
《鞍钢技术》
CAS
1997年第1期1-5,共5页
Angang Technology