期刊文献+

面向产能柔性的综合生产计划模型研究 被引量:3

Research on Aggregate Production Planning Model Objecting to Volume Flexibility
在线阅读 下载PDF
导出
摘要 在阐述产能柔性概念的基础上,分析了影响产能柔性的因素及其能力构成,进而以生产成本、库存成本以及非柔性成本最小化建立了综合生产计划优化模型,最后采用遗传算法予以求解,并通过实例仿真证明了模型和算法的有效性和可行性。 The paper introduces the definition of the volume flexibility, the influence factors and its capability composing. Based on volume flexibility theory, aggregate production planning model to minimize production cost, stock cost and cost of inflexibility is proposed. Finally,the computational results with an example illustrate the efficiency of the proposed planning model and algorithm.
出处 《机械工程与自动化》 2007年第3期79-81,84,共4页 Mechanical Engineering & Automation
关键词 产能柔性 生产计划模型 遗传算法 volume flexibility aggregate production planning model genetic algorithm
  • 相关文献

参考文献4

  • 1宋国防.生产与运作管理[M].北京:科学出版社,2000.
  • 2Khouja M.An aggregate production planning framework for the evaluation of volume flexibility[J].Production Planning and Control,1998(9):127-137.
  • 3玄光南 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 4林中伟,谢强,丁秋林,宁福臣.基于遗传算法的多级有限能力生产计划[J].小型微型计算机系统,2003,24(1):123-126. 被引量:5

二级参考文献8

  • 1[1]Ren Shoujun. Modern manufacturing system analysis and design [M]. Beijing: Science Press, 1999
  • 2[2]Wang, D W. Earliness/tardiness production planning approaches for manufacturing systems [J]. Computers &Ind. Eng, 1995,28:425~436
  • 3[3]Wang, D W. , Fang, S C. A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm [J]. Computers Mathematics with Applications, 1996,31: 31~36
  • 4[4]Wang Wei, Wang D W. Single part JIT production scheduling of manufacturing enterprise based on fuzzy delivery time limit [J].Journal of System Engineering, 1998,2: 63~69
  • 5[5]Tang Li-xin. Theory and application of production batch scheduling under CIMS [M]. Beijing :Science Press, 1999,2
  • 6[6]Xuan Guangman, Cheng Run-wei. Genetic algorithm and engineering design[M]. Beijing: Science Press, 2000,1
  • 7[7]Liu Yong, Kan Li-san,Chen Liu-ping. Non-Numerical current algorithm[M]. Beijing: Science Press, 1995,1
  • 8王玮,汪定伟,王晓琦.基于模糊交货期的单件制造业准时化生产计划[J].系统工程学报,1998,13(2):63-69. 被引量:10

共引文献43

同被引文献19

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部