摘要
施工 3~4.4m空心桩,需要预制空心桩节和护筒、搭建水上平台,进而介绍了钻孔施工、桩节组拼以及压浆等工艺。与实心桩相比,空心桩显示了独特的优越性。
It is necessary to prefabricate hollow pile sections and the conductor casing for the construction of 3 to 4. 4m hollow piles. The drilling process, pile section assembly and grout injection are described. The hollow pile exhibits unque adventage over the solid one.
出处
《探矿工程》
1997年第1期21-24,共4页
Exploration Engineering(Drilling & Tunneling)
关键词
空心桩
钻孔灌注桩
桩节
工程施工
桥梁
hollow bored pipe, pile section, drilling platform, grout injection