渗流场排水子结构法有限元分析的局部非协调网格解法 被引量:6

Local incompatible meshes for finite element analysis in drainage substructure method for solution of seepage field
在线阅读 下载PDF
导出
摘要 在分析用排水子结构法求解渗流场的基础上,针对排水子结构网格疏密交界处的网格非协调问题,提出了局部非协调网格的协调水头解法。该方法根据结点性质将总自由度分为主要自由度和从属自由度,基于线性内插原理,用牛顿迭代法计算插值系数。以江口水电站工程为例,对江口拱坝坝基渗流场进行了求解,计算得正常蓄水位工况渗流量为93.2 L/s,死水位工况渗流量为42.4 L/s,校核洪水位工况渗流量为119.6 L/s,这些结果均小于设计的抽排能力(150 L/s),满足工程要求,说明本文方法是合理的。 Based on an analysis of the drainage substructure method for solution of seepage field, the compatible water level method for local incompatible meshes was proposed to deal with the problem of incompatible meshes at the intersection of dense meshes and sparse meshes of the drainage substrcture. In the method, the degrees of freedom corresponding to each node were divided into the main degrees of ftreedom and the dependent degrees of freedom, and the Newton iteration method, based on linear interpolation principle, was adopted for calculation of the interpolation coefficeient. As a case study, the seepage field of Jiangkou arch clam foundation was calculated. The seepage quantifies were 93.2L/s,42.4L/s,and 119.6L/s at normal water level, dead water level, and cheek flood level, respectively, and the results were less than the design pumping capacity of the dam, therefore, the method was verified to be reasonable.
出处 《水利水电科技进展》 CSCD 北大核心 2007年第2期26-29,共4页 Advances in Science and Technology of Water Resources
基金 国家自然科学基金资助项目(90510017)
关键词 渗流场 排水孔 排水子结构 局部非协调网格 协调水头解法 江口水电站 seepage field drain hole drainage substructure local incompatible mesh compatible water level method Jiangkoa Hydropower Station
  • 相关文献

参考文献7

二级参考文献31

共引文献162

同被引文献42

引证文献6

二级引证文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部