期刊文献+

Entry roof truss-bolt system test under the gob of contiguous seams

Entry roof truss-bolt system test under the gob of contiguous seams
在线阅读 下载PDF
导出
摘要 Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2 seam. The No.9 and No.10-2 seams are contiguous seams. The No.9 seam has been mined out and the No.10-2 seam will be mined under the gob of the No.9 seam. The roof strata of the No.10-2 seam may have been weakened and fractured due to the shear failure caused by the No.9 seam mining activities. The steel beam sets spaced at 0.8 m have been used to support the entry of the No.10-2 seam. In order to speed up the advance rate and cut entry development cost, a test area, using roof bolt in conjunction with truss-system, was successfully conducted. This paper presents the support system design, application of designed system, and the test results. Test results provide a cheaper, quicker, and safer way to support entry for the No.10-2 seam.
出处 《Journal of Coal Science & Engineering(China)》 2007年第1期13-17,共5页 煤炭学报(英文版)
关键词 truss-bolt system gob finite element method(FEM) contiguous seams installed load of bolt 近距离煤层 采空区 巷道顶板 桁架-锚杆支护系统 试验
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部