期刊文献+

襄樊电厂二期工程取排水河段动床物理模型试验研究 被引量:3

Experimental investigation on the channel bed variation in the water intake reach of Xiangfan power plant
在线阅读 下载PDF
导出
摘要 襄樊电厂一、二期工程均以汉江为水源,采用直流供水方式,排水入汉江。本文建立了电厂取、排水口河段动床实体模型,考虑了在建的南水北调工程和拟建的崔家营航电工程对该河段的河床演变和水流泥沙运动影响,从三维空间角度详细研究了取、排水河段水流泥沙运动及河道冲淤演变趋势、取水口附近底沙运动情况、取水安全可靠性等问题,并提出了稳定取、排水口附近河岸及保证取水可靠的建议性措施。 The first and second stage of Xiangfan power plant is designed to take water from Hanjiang River and drain the cooling water into the same River. The physical model for the intake and outlet reach has been built in this paper. At the same time, the influence of South-North Water Transfer Project and Cuijiaying hydroelectric project on the riverbed deformation and flow-sediment movement are investigated. Finally, some suggestions are given to stabilize bank near the intake and outlet reach and to assure the safe water taking.
出处 《泥沙研究》 CSCD 北大核心 2007年第1期76-80,F0003,共6页 Journal of Sediment Research
基金 国家"973"计划资助(2003CB415206) 国家自然科学基金项目(50209012)
关键词 襄樊电厂 动床实体模型 取排水口 取水安全性 Xiangfan power plant physical model for sediment transport water intake and outlet safety of water taking
  • 相关文献

参考文献3

  • 1杨国录 吴卫民 等.《SUSBED-1,2》恒定动床数学模型.水利学报,1992,(1).
  • 2谢鉴衡.河流模拟[M].北京:水利电力出版社,1993..
  • 3张瑞瑾.河流动力学[M].北京:水利水电出版社,1993.

共引文献12

同被引文献14

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部