摘要
无线闭塞中心(RBC)是列车控制系统(CTCS)中的重要组成部分,它是一个基于计算机的系统,根据从外部轨旁系统得到的基本信息及由车载子系统得到的信息产生传输给车载子系统的信息,这些信息的主要目的是提供运行许可(MA)并且在线路上进行多辆列车的间隔管理,使列车在RBC管辖范围内的线路上安全高效地运行。探讨利用统一建模语言(UML)来描述和建立CTCS3级仿真系统中RBC模型的关键部分并分析其优势所在。RBC的仿真平台基于C++ Builder 6.0以及Rational Rose。
Radio Block Center was one of the most important parts of Chinese Train Control System. RBC was a System based on computers which created the information for Onboard System based on the information from Trackside and Onboard systems. The information was mainly for providing move authority and managing train separation which could ensure trains running in the area of the RBC safely and effectively. The key parts of CTCS level 3 using UML were described and modeled as well as its advantages were analyzed. The computer simulations of RBC was based on C++ Builder 6.0 and Rational Rose.
出处
《铁路计算机应用》
2007年第3期43-45,共3页
Railway Computer Application
基金
国家自然基金重点项目(60332020)