摘要
分析了三相五柱变压器的过渡过程及其三相三柱的不同特点,得出了只有用减小电路电感的方法才可缩短测量时间的结论。
The transient process of three-phase five-limb transformer and the charactersitics which are different from three-phase three-limb transformer are analyzed. It concludes that shortening measurement time can only be achieved through reducing circuit inductance.
出处
《变压器》
北大核心
2007年第3期36-39,共4页
Transformer
关键词
变压器
暂态过程
磁通
Transformer Transient process Flux