摘要
天然地基承载力不能满足要求时,必须采用桩基加固塔吊基础。某高层建筑施工场地狭小,无法进行正常桩基础施工,采用微型桩加固塔吊地基处理仅用1d时间,经济效益良好,塔吊运行安全。
Piles must be applied to reinforce the tower crane foundation when the bearing capacity of natural soil cannot meet the load requirements. But limited by narrow construction area, pile construction could not be normally carried out at a high-rise building site. Mini-pile was therefore adopted for the reinforcement. The foundation treatment was completed in one day economically and safely.