摘要 以省级电网调度自动化系统为例,通过分析电网调度自动化系统发展面临的问题和“十一五”期间电网调度自动化系统的发展需求,初步提出新时期省级电网调度自动化系统的建设思路和技术方案。设计方案阐述了采用统一系统平台和数据中心重新构建电网调度自动化系统的体系结构,重新划分系统的应用区域,重新整合和优化业务功能(功能群)等全新的设计理念,为“十一五”期间省级电网调度自动化系统的发展和建设提供参考思路。 Taking the provincial gird dispatch automation system as an example, problems facing the development of grid dispatch automation systems as well as demands for grid dispatch automation system development during the "11 th Five-Year" period are analyzed, and the construction idea and technical scheme for the provincial gird dispatch automation system in the new era are proposed. The design scheme presents some brand-new design concept, e.g. the unified system platform and data center should be used to reconstruct the grid dispatch automation system structure, the application area of the system should be reclassified, the business functions (function group) should be reintegrated and optimized.
作者 储真荣
机构地区 华东电力设计院
出处 《华东电力》 北大核心 2007年第2期28-31,共4页 East China Electric Power
关键词 调度自动化系统 统一平台 数据中心 应用区域 功能群 dispatch automation system unified platform data center application area function group
  • 相关文献

参考文献2

二级参考文献27

  • 1James Resek. Control Center API Guidelines. EPRI Control Center API Project(RP 3654-1), 1996
  • 2Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 301: Common Information Model (CIM). Draft 6
  • 3Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 302: Common Information Model (CIM) Financial, Energy Scheduling, and Reservation. Draft 2
  • 4Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 303: Common Information Model (CIM) SCADA. Draft 2
  • 5Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 401: Component Interface Specification Framework. Draft 3
  • 6Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 402: Common Data Access Facility. Draft 3
  • 7Draft IEC 61970: Energy Management System Application Program Interface(EMS-API)-Part 501: CIM RDF Schema. Draft 2
  • 8陆杏全(Lu Xingquan).电网调度集成化信息系统--新一代电网调度自动化系统(Power System Dispatching Information Integrated System--Advanced Power System Dispatching Automation System).见:2001年电力信息技术(IT)应用与发展学术研讨会论文集(In: Proceedings of 2001 Conference on Application and Advance of Power System Information Technologies).杭州(Hangzhou): 2001.108-113
  • 9OMG. CORBA系统结构、原理和规范(The Common Object Request Broker: Architecture and Specification).北京:电子工业出版社(Beijing: Publishing House of Electronics Industry),2000
  • 10Best Bets Results for Microsoft. http://www.microsoft.com/net

共引文献165

同被引文献40

引证文献2

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部