摘要 以抽水蓄能电站各项辅助服务中最为重要一项———旋转备用辅助服务为对象,利用蒙特卡罗随机生产模拟技术,研究抽水蓄能电站最优抽水策略下发电工况下旋转备用容量的定价理论,给出了以边际成本确定旋转备用容量电价的模型方法,以及抽水蓄能电站在发电工况下旋转备用的效益模型。并结合算例说明了模型的正确性和合理性。目的在于使各厂家在发电工况下机组提供备用时能够在提供电能和提供备用之间作出合理的选择,充分体现出其容量的市场价值,使旋转备用的效益达到最优。 The benefit of spinning reserve capacity of pumped-storage plant is the most important and takes large proportion among all the its dynamic benefits. This paper introduces the definition and main contents of spinning reserve, renders the model of defining the spot price of spinning reserve according to the marginal cost pricing and the model of benefit of spinning reserve capacity in the generating conditions under the optimal pumping strategy of generation sets and the optimal pumping strategy of pumping sets based on Monte-Carlo simulation model for pumped storage power station. The results of calculation examples are given to prove the validity and practicability of the model.
机构地区 华北电力大学
出处 《太原理工大学学报》 CAS 北大核心 2007年第2期171-174,共4页 Journal of Taiyuan University of Technology
基金 华北电力大学青年基金资助项目
关键词 电力系统 抽水蓄能电站 最优抽水策略 旋转备用 power system pumped-storage power station optimal pumping strategy the spinning reserve
  • 相关文献

参考文献5

二级参考文献18

  • 1曼昆.经济学原理[M].北京:北京大学出版社,1999..
  • 2王锡凡,电力系统规划基础,1994年
  • 3Chuang A S, Wu F, Varaiya P. A game-theoretic model for generation expansion planning: problem formulation and numerical comparisons [J].IEEE Transactions on Power Systems, 2001,16(4): 885-891.
  • 4Richter C W, Sheble Jr, G. B, Ashlok D. Comprehensive bidding strategies with genetic programming/finite state automata [J]. IEEE Transactions on Power Systems, 1999,14(11): 1207-1212.
  • 5Song H L, Liu C C. Lawarree. Optimal electricity supply bidding by markov decision process [J]. IEEE Transactions on Power Systems,2000,15(5): 618-624.
  • 6Shangyou Hao. A study of basic bidding strategy in clearing pricing auctions [J]. Proceedings of the 21st 1999 IEEE International Conference,Power Industry Computer Applications,1999,55-60.
  • 7国家计委.建设项目国民经济评价—参数与方法[R].1987.
  • 8丁民.蓄能电站的负荷备用效益[J].水能技术经济,1993,(4):7-7.
  • 9陈育文.抽水蓄能电站调峰填谷节煤效益研究[J].水能技术经济,1992,(2):13-13.
  • 10P Guiehon.Operation of pumped storage power stations[A].国际抽水蓄能会议论文集[C].1991.

共引文献91

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部