摘要
根据输电线路中杆塔施工的实际工程需要,建立了杆塔整体起吊的数学模型,编制了抱杆参数优化和杆塔整体起吊最佳方案设计的软件,解决了杆塔施工中的难题。
To fulfil field demand of pole tower erection,the mathematical model for pole tower integral hoisting is established. software of gin pole parameters optimization and design of best scheme of pole tower integral hoisting is programmed to solve difficult problems encountered in pole tower erection.
出处
《东北电力学院学报》
1996年第1期75-82,共8页
Journal of Northeast China Institute of Electric Power Engineering