摘要
文中论述了曲亭水库除险加固工程中高压喷射灌浆试验的过程、其效果的检查、参数的确定方法,为高压喷射灌浆工艺的发展提供了宝贵的经验。
This paper narrates the test process of high-pressure jet grouting,the inspection of its effect and the method to determine construction parameters for consolidation works of Quting Reservoir.All of these provide valuable experiences for development of high-pressure jet grouting technique.
出处
《山西水利科技》
2007年第1期14-16,19,共4页
Shanxi Hydrotechnics
关键词
除险加固
高压喷射灌浆
试验
consolidation and eliminating danger high-pressure jet grouting test