关于大坝施工导流方式及围堰洪水标准问题 被引量:5

On Pattern of Dam Construction Diversion and Flood Control Criterion of Cofferdam
在线阅读 下载PDF
导出
摘要 通过对同在一条沁河上而条件却有明显不同的张峰与磨滩二座大坝在施工导流中所出现的问题,说明正确的导流方案除必须研究导流工程自身的技术经济条件外,尤其要处理好与移民、施工准备、坝址区地形地质条件等外部条件的关系。全断面截流围堰的防洪标准,除考虑本工程自身的保护外,要特别注意围堰失事对下游河道沿岸村庄、工矿企业的影响。现行断流围堰洪水标准偏低,宜适当提高,并采用非常溢洪道等应急措施。 This paper introduces the problems of dam construction diversion that occur in the construction process of Zhangfeng Project and Moran project. These two projects are constructed across the same river,Qinghe River, but the construction conditions are very different.In order to correctly determine construction diversion plan,the author indicates that besides the technique-economy condition of construction diversion works,the relationship of outside conditions between emigration,construction preparation and topography geology condition must be seriously handled.For the sake of determining flood control criterion of cofferdam in the condition that the closure plan in all bed of river is selected,the influence of cofferdam failure on the villages,factorys and mining industy enterprises must be thinked specially,except thinking the protect of the project itself.The current flood control criterion of closure in all bed of river is lower.The author suggests suitably raising it and applying some other measures such as emergency spillway etc.
作者 赵廷式 韩龙
出处 《山西水利科技》 2007年第1期1-3,7,共4页 Shanxi Hydrotechnics
关键词 围堰 施工导流 洪水标准 cofferdam construction diversion flood control criterion
  • 相关文献

同被引文献23

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部