某跨线桥施工支架方案设计 被引量:1

Steadier scheme design in one flyover construction
在线阅读 下载PDF
导出
摘要 结合某大桥的概况,根据梁体施工工艺要求、现场实地勘察情况确定跨线施工方案,支架采用布架灵活、搭拆方便、承载力大的WDJ碗扣式多功能钢支架,部分预应力现浇连续箱梁采用支墩加纵梁预留门洞的支架现浇,取得良好效果。 Combined with one bridge survey, the over line construction scheme is determined by beam construction technique requests and practical exploration in field, the WDJ bowled multi-functional steel bracket whose characteristics are flexible layout, convenient lapping and taking apart and big beating capacity is used, and some prestressed continuous box beams cast-in-place are pouring by the bracket whose pillar with searching counter-door. The effect is good.
作者 余勇
出处 《山西建筑》 2007年第2期315-316,共2页 Shanxi Architecture
关键词 PC连续梁 跨线 模板结构 支架结构 PC continuous beam, over line, form board structure, bracket structure
  • 相关文献

参考文献2

  • 1姚玲森.桥梁工程[M].北京:人民交通出版社,1993..
  • 2黄绳武.桥梁施工及组织管理[M].北京:人民交通出版社,1995.109-125.

共引文献16

同被引文献2

  • 1.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 2GB5001l-2010建筑抗震设计规范[S].北京:中华人民共和国住房和城乡建设部,2010.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部