结合工程概况,介绍了现浇梁的施工工艺,并对地基处理、支架搭设、支架预压、模板施工等环节的施工要点进行了阐述,供类似工程参考借鉴。
Combined with practical work construction technology of east-in-place box beam is introduced. From foundation treatment, supporter erection, formwork construction and other aspects construction key points are presented in order to provide references for similar works.
出处
《山西建筑》
2007年第2期165-166,共2页
Shanxi Architecture
关键词
满堂支架
地基处理
模板施工
现浇梁
full framing, foundation treatment, formwork construction, cast-in-place beam