摘要
根据建设项目的全过程造价控制,从决策阶段、设计阶段、招投标阶段、施工阶段、竣工阶段介绍了加强建设项目的工程造价管理措施,使人力、物力、财力得到充分利用,取得良好效益。
According to overall-process cost control of building project, the author introduces the measures to strengthen construction cost management of building project from the stages of decision-making, design, bidding, construction and completion, in order to fully use manpower, material resources and financial resources and to achieve well benefits.
出处
《山西建筑》
2007年第1期251-252,共2页
Shanxi Architecture
关键词
工程造价
限额设计
成本控制
construction cost, quota design, cost control