摘要
结合工程实例,对纠偏方案的确定进行了分析,从纠偏机具的选择和测量方法对纠偏过程的实施进行了阐述,同时对纠扭过程的实施进行了分析,以保证顶管管节更准确地按设计轴线顶进。
Combined with practical work, scheme for deflection correction is determined. From the selection of correction equipment and measurement methods concrete construction methods are introduced as well as twist correction process in order to ensure pipe jacking construction well. along with designed axes.
出处
《山西建筑》
2007年第1期149-150,共2页
Shanxi Architecture
关键词
纠偏技术
纠扭技术
顶管工程