摘要
结合预制箱梁冬季施工期间蒸汽养护的实际经验,对养护期间四个主要温控阶段的温度控制技术进行了详细的分析和经验总结,为类似工程的施工提供了有益的经验借鉴。
Combined with experienees steam-curing of preeast box beam in winter four important temperature control stages in curing period are introduced in detail. Experiences are summarized, which provide good references for similar works.
出处
《山西建筑》
2007年第1期140-141,共2页
Shanxi Architecture
关键词
蒸汽养护
温度控制
裂纹
混凝土
steam-curing, temperature control, crack, concrete