期刊文献+

双层完井技术提高底水油藏开发效果 被引量:13

Application of dual completion technology to improve development effect of bottom-water reservoir
在线阅读 下载PDF
导出
摘要 双层完井的目的是在同一口油井进行油水同时分采,从而有效抑制底水锥进,加速底水油藏开发。该技术在油、水区分开完井,中间用封隔器隔开,油水界面以上的原油从环空中采出,油水界面以下的水从油管中采出。通过合理优化上、下完井段的排液量,可以提高底水油藏的开发速度和最终采收率。对该技术的技术原理、完井关键参数设计、理论和实验研究方法以及油田应用效果进行了详细的论述。油田应用效果表明,该技术既可用于新井的高效开发,也可使完全水淹报废井恢复生产。如果参数控制合理,采出的油可直接输入到油罐中,采出的水可直接排放或简单处理后回注地层,具有很好的经济效益和环保优势。 Dual completion technology means producing oil and water in the same oil well, with the aim to eliminate bottom water coning and accelerate the process of developing bottom-water reservoir. This paper thoroughly discusses the principle, critical parameters design, theoretical and experimental research methods, and field application results of the dual completion technology. Two sets of production system are installed in oil zone and water zone separately and separated by a conventional packer, with the oil flowing to surface through tubing/casing annulus and the water flowing to surface through tubes. Oil production rate and ultimate recovery will be improved remarkably if the two different completion zones are optimized and controlled reasonably. The dual completion technology has been applied in oil field, showing that it can not only be used for effective development of new wells but is also capable of restoring abandoned wells caused by water flooding. If operation parameters are controlled effectively, produced water-free oil can be piped to oil tanks directly and oil-free water can be discharged directly or re-injected into formation after simple processing, which brings good economic results and is beneficial to environmental protection.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2007年第1期103-106,共4页 Oil Drilling & Production Technology
关键词 双层完井 井底排水 底水油藏 底水锥进 油水分采 dual completion downhole discharging water bottom water coning selective production system of oil and water
  • 相关文献

参考文献13

  • 1WIDMYER R H.Producing petroleum from underground formations[P].U.S.Patent No.2 855 047,1955.
  • 2PIRSON S J,MEHTA M M.A study of remedial measures for water-coning by means of a two-dimensional simulator[C].SPE 1 808,42th SPE Meeting,Houston,1 -4 October,1967.
  • 3FISHER W G,LETKEMAN J P,TETREAU E M.The application of numerical coning model to optimize completion and production methods to increase oil productivity in bellshill lake blairmore pool[J].JCPT,1970,9 (10):33-39.
  • 4WOJTANOWICZ A K,XU HUI,BASSIOUNI Z.Oil well coning control using dual completion with tailpipe water sink[C].SPE 21 654.SPE Production Operations Symposium,Oklahoma City,Oklahoma,April 7-9,1991.
  • 5SWISHER M D,WOJTANOWICZ A K.In-situ segregated production of oil and water-a production method with enviromental merit:field application[C].SPE 29 693,SPE/EPA Exploration and Production Enviromental Conference,Houston,TX,March 27 -29,1995.
  • 6SHIRMAN E I.Experimental and theoretical study of dynamic water control in oil wells[D].PhD Dissertation,Louisiana State University and A&M College,Baton Rouge,LA.,1998.
  • 7INIKORI S O.Numerical study of water coning control with downhole water sink (DWS) completions in vertical and horizontal wells[D].PhD Dissertation,Louisiana State University and A&M College,Baton Rouge,LA.2002.
  • 8WOJTANOWICZ A K,SHIRMAN E I,kurban H.Downhole water sink (DWS) completion enhance oil recovery in reservoirs with water coning problem[C].SPE 56 721,SPE Annual Technical Conference and Exhibition,Houston,Texas,U.S.A.,3-6 October,1999.
  • 9INIKORI S O,WOJTANOWICZ A K.Water control in oil wells with downhole oil-free water drainage and disposal[C].SPE 77 559,SPE Annual Technical Conference and Exhibition,San Antonio,Texas,U.S.A.,29 September-2 October,2002.
  • 10SHIRMAN E I,WOJTANOWICZ A K.Water cone histeresis and reversal for well completions using the moving spherical sink method[C].SPE 37 467,Production and Operation Symposium,Oklahoma City,Oklahoma,USA.9-11 March,1997.

同被引文献58

引证文献13

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部