汤峪水电站突甩负荷过渡过程的数值解 被引量:1

Numerical Solution for Abruptly Unloading Transient Process of Tangyu Hydroelectric Plant
在线阅读 下载PDF
导出
摘要 运用外特性数值解法,结合汤峪水电站具体情况,建立了突甩负荷过渡过程求解的数学模型,并编制了计算程序;针对不同导叶关闭规律和不同调压阀行程及其组合情况,进行了多种方案的求解,从而了解了有关水力要素及机组工况参数的瞬变规律。 Using external characteristic numerical solution method in combination with condition of Tangyu Hydroelectric Plant,the paper establishes the mathematical model for solution of abruptly unloading transient process.In accordance with the closure law of different guide vanes,the travel of different regulating valves and their combination,the solution of varied alternatives is carried out,so the instantaneus variation law of concerned hydraulic elements and unit operation parameters is found out and the basis for safe and stable operation of plant is presented.
作者 何文学
机构地区 西北农业大学
出处 《水电站设计》 1996年第4期35-39,共5页 Design of Hydroelectric Power Station
关键词 混流式水轮机 过渡过程 数学模型 计算 汤峪水电站 francis turbine,transient process,mathematic model,calculation,Tangyu Hydropower Station.
  • 相关文献

同被引文献21

引证文献1

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部