隧洞及压力管道设计中的外水压力修正系数 被引量:64

Correction factor of external water pressure in design of tunnel and penstock
在线阅读 下载PDF
导出
摘要 外水压力是隧洞衬砌及压力管道的重要荷载。作用在衬砌上的外水压力水头与地下水位至隧洞的水柱高之比称为外水压力折减系数。由于实际工程中这一系数不恒小于1,故建议定义为外水压力修正系数。提出初始修正系数等3个分项系数的新概念,并将分项系数的乘积定义为综合修正系数,以期能较好地解决外水压力不确定性的这一困扰设计人员的难题。 External Water pressure is an important load for the tunnel lining and penstock.The ratio of external waterPressure acting on the tunnel lining to the difference between underground water level and tunnel water head iscalled as reduction factor of external water pressure. This factor is not always less than one so it is supposed to bedefined as correction factor of external water I)ressure. Meanwhile, a new concept of 3 sub-factors for initial correction factor has been put forward and the product of 3 sub-factors has been defined as comprehensive correction factor to hope solve the uncertainty of external water pressure.
作者 张有天
出处 《水力发电》 北大核心 1996年第12期30-34,共5页 Water Power
关键词 水工隧洞 压力管道 衬砌 外水压力 修正系数 lining, penstock, external water pressure, correction factor
  • 相关文献

参考文献1

  • 1张有天,张武功,王镭.再论隧洞水荷载的静力计算[J]水利学报,1985(03).

同被引文献371

引证文献64

二级引证文献448

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部