摘要
本文对低水头大流量枢纽的泄洪能力、消能设计、下游防冲设计、闸门泄洪调度等问题进行研究。对消力池内消能率的计算提出了新的见解。
This article investigstes such problems for low head project with large flow as flood discharging capacity,design of energy dissipation, design of erosion protection downstream and regulation of discharge by gates. Somenew ideas are put forward for calculating the ratio of dissipation in stilling basin.
出处
《人民珠江》
1996年第5期23-27,共5页
Pearl River
关键词
低水头
大流量
消能防冲
水利枢纽
设计研究
low head project with large flow erosion protection through energy dissipation design and investiationratio of dissipation Froude number