摘要
通过唐山热电厂2×300 MW湿法脱硫的工程实践,结合国内其他脱硫工程的应用经验,对湿法脱硫工艺中的增压风机的选型、布置、安装、运行、维护进行简单探讨。
Based on the WFGD project in TangShan thermal power plant 2 × 300 MW units of Datang corporation in Hebei province and combined the experience in other WFGD projects, the choice, arrangement, installation, operation and maintenance of BUF in WFGD were primarily discussed.
出处
《电力环境保护》
2007年第1期36-38,共3页
Electric Power Environmental Protection